Laserfiche WebLink
I 11.C.c I <br /> FY19 Pavement Preservation=SR89,Gail Gardner,Sundog Ranch Parking Lot Chip Seal <br /> Cactus Asphalt <br /> �a <br /> Item#I. •• Item Description, ' , .. , I Qty I Unit I' Unit Price I ;.Total Price, u <br /> SR 89(PMAR chip with PMM Fog) a- <br /> 3-15 IPMM Seal Coat I 58,500 I 'SY I $ 0.60 I $ 35,100.00 V <br /> 3-17. 'Seal Coat'Binder-Haul and Apply Services I- 61 . I TON I.$ 569.00 I.$ 34,709.00 g <br /> 0 <br /> 3-18 'Traffic Control-Seal Coat Sealing ' , 61. I•TON I. $ 222.00 I $ 13,542.00 z <br /> (Chip Seal Binder:.Polymer Modified Asphalt Rubber(PG58-22,16%Tire Rubber,3%SBS d <br /> 4-14 146 TON $ 620.28 $ 90,560.88 al <br /> Polymer)>100 TN • I ` <br /> 4-19 .(Chip Seal Binder-Haul&'Apply Services . I 146 I TON I-$ 102.00 I $. 14,892.00 . . a <br /> r <br /> 4-23 'Chip Seal Aggregate-HV Pre-coated I 825. ' 'TON.I $ 103.001 $ 84,975.00. d <br /> 4-28 'Traffic Control Chip Seal(Based on Binder Ton) ' _ 146 ' ' TON. I. $ 40.00 I.$ 5,840.00 <br /> 115 MIL(4"")White,Traffic Paint Stripe 20960 LF(Measured Distance)X 2(Temp and Perm o. <br /> 7-4. 62,880 LF` $ 0.16 $ 10,060.80 <br /> Applications)X 1.5.(Convert to 6., Quantity) <br /> w <br /> MIL(4")Yellow Traffic Paint Stripe 20671 LF(Measured Distance)X 2(Temp and Perm LL7-5 68 013 LF $ 0.16 $ 10,882.08115 <br /> Applications)X 1:5(Convert to 6"Quantity) ' I' I' <br /> co <br /> 7-6 'Paint Symbol Arrow*Double Arrows to.be Paid as 1.5 Single Arrows* I 16 I EA I $ 79.00 I $ ' 1,264.00 CNI <br /> 7-9 'Paint Legend"Only" I 4 I . EA I $ 79.00 I $ 316.00' <br /> N <br /> 7-12 'Transverse Thermoplastic(4") I 396 i LF I. $ 0.651'$ 257.40 r <br /> 7-13 ,'Th'ermoplastic Pavement Arrow 90 MIL*Double Arrows To Be Paid As 1.5 Single Arrows* I 16 I EA I' $ 158.00 I.$ 2,528.00 . Q <br /> 7-15 'Thermoplastic Ledgend"Only"90 MIL' I 4 I EA I $ 189.001 $ 756.00 a <br /> N <br /> 9-1 'Traffic Control(Not for Items No. 1-5):TC for Striping and Survey ' 1 I' LS I $ 8,000.00;I $ 8,000.00 IS <br /> 3 <br /> Message Board(Per Unit Per Day):4 Message Board Placed 7 Days in Advance and to Remain �j <br /> 9-2 96 DAY $ 75.00 $ 7,200.00 <br /> (Throughout Duration of Project. . . °) <br /> 9-6 (Document Existing Pavement Markings I 1 ' LS I $ 14,500.001 $ 14,500.00 co(0 <br /> SR 89 Subtotal I.$ 335,383.16 r <br /> Gail Gardner Way(PMAR Chip with PMM Fog) uu.. <br /> 3-15 IPMM Seal Coat : I 14,420 I SY '.I°$ 0.60"I $ 8,652.00as <br /> 3-17, 'Seal Coat Binder-Haul and Apply Services I 15 I TON I $ 569.00 I $ 8,535.00 E <br /> E. <br /> 3-18 .'Traffic Control-Seal Coat Sealing I. 15 I TON I $ 222.00 I.$. 3,330.00 <br /> u) <br /> Chip Seal Binder:Polymer Modified Asphalt Rubber(PG58-22. 16%Tire Rubber,3%.SBS <br /> 4-1439 TON $ 620.28 I $ 24,190.92 c <br /> fPolymer)>100 TN I, I d <br /> 4-19 'Chip Seal Binder-Haul&;Apply Services I 39 I TON I:$ 102.00 I.$ 3,978.00 5 <br /> 4-23 'Chip Seal Aggregate-HV Pre-coated ' 232 I TON I $ 103.00 I,$ 23,896.00 <br /> 4-28 .'Traffic Control-Chip Seal(Based on Binder Ton) ' 39 I TON I $ 40.00 I $ 1,560.00 Q <br /> I Packet,Pg. 158 I <br />