Laserfiche WebLink
• <br /> I 11.E.b I <br /> Prescott City Code Page 4/5 <br /> CHAPTER 3-14:DEVELOPMENT FEES <br /> 5/8-inch $862 $5,303 <br /> 3/4-inch $1,293 $7,955 <br /> 1-inch $1,437 $8,839 <br /> 1.5-inch $2,873' $17,676 <br /> 2-inch $4,597 $28,282 <br /> 3-inch $8,620 $53,030 <br /> 4-inch $14,367 $88,384 <br /> 6-inch . $28,733 . $176,766 <br /> 8-inch $45,973 . $282,826 <br /> (B)In the event that a one(1)inch meter or larger is required solely as a result of a residential unit being equipped <br /> with an automatic fire sprinkler system,the development fee to be assessed pursuant to this section shall be based on <br /> the actual size meter needed to serve the fixtures within a residential unit(s). o <br /> a <br /> (C)In the event that an upsizing of meter size is required as a result of remodeling,renovation or expansion of a <br /> structure,the development fee to be assessed pursuant to this section shall be the difference between the current <br /> development fee for the upsized meter versus the current development fee for the existing meter. co <br /> a> <br /> u- <br /> (D)Fees collected pursuant to this section may only be used for purposes related to the City's water production, <br /> treatment,transmission and distribution system,as identified in the City's most recent infrastructure improvement a <br /> plan("IIP")and authorized pursuant to A.R.S. § 9-463.05,as amended.(Ord.4523,2-7-06,eff.5-08-06;Ord.4665, E <br /> 10-28-2008,eff.7-11-2009;Ord.4665 suspended by Ord.4721-1018,eff.03-23-2010;Ord.4889-1427,6-24-2014. •• <br /> Formerly 3-14-14) v <br /> 3-14-13 DEVELOPMENT FEES FOR WASTEWATER IMPACTS: <br /> (A)All new construction to be connected to the City's wastewater system,within or outside the City limits,shall be . Q <br /> assessed the following development fee for wastewater system impacts: <br /> w <br /> • ai <br /> co <br /> METER SIZE WASTEWATER SERVICE co <br /> AREA A <br /> 5/8-inch • $3,020 N <br /> 3/4-inch $4,530 <br /> 1-inch $5,033 <br /> 1.5-inch $10,067 C <br /> 2-inch . $16,107 <br /> 3-inch $30,200 O <br /> 4-inch $50,334 <br /> 6-inch $100,667 <br /> 8-inch $161,068 <br /> E <br /> 0 <br /> (B)In the event that a one(1)inch meter or larger is required solely as a result of a residential unit being equipped <br /> with an automatic fire sprinkler system,the development fee to be assessed pursuant to this section shall be based on <br /> the actual size meter needed to serve the fixtures within a residential unit(s). <br /> (C)In the event that the connection is solely for wastewater,the wastewater development fee shall be based on the <br /> size water meter needed to serve the fixtures within the residential unit(s). <br /> (D)In the event that an upsizing of meter size is required as a result of remodeling,renovation or expansion of a <br /> structure,the development fee to be assessed pursuant to this section shall be the difference between the current <br /> development fee for the upsized meter versus the current development fee for the existing meter. <br /> The Prescott City Code is current through Ordinance. <br /> I Packet Pg. 186 I <br />