Laserfiche WebLink
9.H.a <br />City of Prescott, Arizona <br />Water and Wastewater Rate Study <br />Wastewater rate structure alternatives will be based on the results of the discussions with City staff and City <br />Council during Task 1. We will evaluate the existing wastewater rate structure and up to two (2) alternative <br />wastewater rate structures. We will develop test -year rates for the selected rate structure alternatives and annual <br />rates for a multi -year period for up to three (3) years. We are anticipating the focus of the alternatives to be <br />evaluations of the base and volume rates for each customer class. <br />Changes to customer class rates stem from changes in the overall revenue requirement, class cost -of -service, and <br />changes to the structure. The combination of these changes can have significant impact on customer's bills. In our bill <br />impact analysis, we will generate monthly bills at each level of usage comparing the cumulative impact from the <br />change in revenue requirement, class cost -of -service and any changes in the rate structure to the bills under existing <br />rates. For each alternative will create bill comparison for typical monthly usage. We will also develop a customer <br />bill impact analysis. The bill impact analysis shows the dollar change the percentage change between the <br />alternative structures compared to customer bills under existing rate structures. This task uses detailed billing data <br />from Task 2 to complete this task. <br />Raftelis will also develop a typical bill survey and compare against bills for the same 10 peer wastewater utilities <br />selected during the Task 1 project initiation meeting. The typical water and wastewater bills will be combined. <br />TASK 5 <br />Preparation of Water and Wastewater Rate Study Report <br />Raftelis will prepare a draft water and wastewater rate study report which documents the overall study findings, <br />recommendations and material assumptions and considerations including detailed calculations supporting the <br />proposed rate alternatives. Raftelis will prepare a single version of the draft report for review by City staff. The draft <br />report will be provided in an electronic format for staff review and we will incorporate mutually agreed upon <br />changes and provide to the City up to 20 bound copies as well as a .pdf version of the final study report. <br />TASK 6 <br />Presentations / Meetings <br />Presentations to refine and communicate interim and final study recommendations as well as onsite project <br />meetings are proposed to be completed throughout the study. We propose the following to complete on -site project <br />meetings with City staff throughout the project. <br />• Project kick-off meeting to affirm study objectives, gather data and City input, fmalize study schedule, and <br />provide the foundation for the study <br />• Project workshop to review and refine interim study results and is most useful to be completed in person. <br />To augment on -site meetings, phone calls and/or GoToMeetings will be completed as necessary to support the <br />requirements of the subsequent tasks. <br />Raftelis will present overall study findings and recommendations to City Council. We will attend up to two City <br />Council meetings and/or public hearings as may be necessary. Raftelis will be responsible for preparation of <br />meeting and presentation materials. <br />Attachment: Raftelis Scope of Work -Prescott DIF and Rate Study (2124 : Rate & Fee Study Contract with Raftelis) <br />RAFTEL1S <br />Water and Wastewater Utility Rate Study - Attachment Page 6 <br />Packet Pg. 255 <br />