My WebLink
|
Help
|
About
|
Sign Out
Home
CC - Agendas - City Council - REGULAR - 11/28/2017
>
City Clerk
>
Permanent Records
>
Permanent
>
CC - Agendas - City Council - REGULAR - 11/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:47:56 AM
Creation date
11/12/2018 11:24:22 AM
Metadata
Fields
Template:
CC - Agendas
Department
City Clerk
Sub
Clerk Records
Content
Agendas
Committee Status
Current
Document Type
City Council
Meeting Type
REGULAR
Meeting Date
11/28/2017
Retention
Permanent
Retention Type
Permanent
Security
Public
Scanner
Conversion
Scan Date
12/5/2017
Record Series
GS1016, #10260
Supplemental fields
Conversion Number
3218958
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I 8.C.a <br /> billed them at the rates described in our response to this RFP, In truth,there is a potential that they <br /> would finish much quicker. Ifthis happened,we would be willing to bill the City for the actual time <br /> required. <br /> Sample Job#2: <br /> 16 Hours at$75/Hour for and Electrician=$1,200 <br /> 16 Hours at$85/Hour for a Programmer/Engineer=$1,360 <br /> Final Price=S2,560 <br /> 15 <br /> Again,like in the previously described project,the City has made our jobs relatively easy by <br /> performing all of the prep-work and by providing thorough documentation. To accomplish the c) <br /> installation and programming of the VFD,Ripple Industries will need to provide an electrician and a <br /> programmer.We have allocated one day(8 hours for each employee)for installation and programming •5 <br /> and we have allocated another day(8 hours for each employee)for testing and commissioning.As in <br /> the case with the previous scenario, if less time were required,less time would be billed. <br /> Sample Job#3: <br /> 16 Hours at$85/Hour for a Programmer/Engineer=$1,360 <br /> Final Price=$1,360 <br /> a <br /> co <br /> U <br /> Modifications need to be made to the GE Fanuc PLC code to insure that the injection well valves are <br /> opened prior to activation of the extraction well pumps. If valve status signals are available,then <br /> programming should be added that prohibits the extraction well pumps from being called into service <br /> until and unless the injection well valves are open. If the extraction well pumps are ever activated and N <br /> the injection well valves are not opened,then an alarm should be generated in the SCADA system. <br /> If the injection well valve status signals are not available,then the possibility of adding them should be <br /> considered. If they are not available and if adding them is not an option,then a timer could be added to <br /> co <br /> the PLC code to slow the activation of the extraction well pumps. In this event, an operator <br /> configurable time entry field should added to the Wonderware HMI that would allow operators to <br /> control the time delay period for activation of the extraction well pumps. Truly,this option should onlyCD <br /> be considered secondarily to the actual monitoring of the injection well valve statuses. H <br /> If no additional equipment is to be added to incorporate signals from the injection well valves,then the <br /> programming involved would require less than 16 hours to accomplish. o. <br /> c <br /> C. Price. E <br /> 1.Please see attached Price Paged. =° <br /> 2. Scheduled rates are discounted and located on price page. <br /> 3. See Price page, and please see below <br /> I Packet Pg. 55 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.