My WebLink
|
Help
|
About
|
Sign Out
Home
CC - Agendas - City Council - REGULAR - 12/2/2014
>
City Clerk
>
Permanent Records
>
Permanent
>
CC - Agendas - City Council - REGULAR - 12/2/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:47:56 AM
Creation date
11/12/2018 11:25:16 AM
Metadata
Fields
Template:
CC - Agendas
Department
City Clerk
Sub
Clerk Records
Content
Agendas
Committee Status
Current
Document Type
City Council
Meeting Type
REGULAR
Meeting Date
12/2/2014
Retention
Permanent
Retention Type
Permanent
Security
Public
Scanner
Conversion
Scan Date
12/2/2014
Record Series
GS1016, #10260
Supplemental fields
Conversion Number
2976031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I•A• <br /> ('ITYor PREs(1Orrr <br /> _IT,40`�°:'f1;5""tO"^" COUNCIL AGENDA MEMO <br /> MEETING DATE/TYPES: COMBINED WORKSHOP AND 12-02-2014 <br /> REGULAR VOTING SESSION <br /> DEPARTMENT: Public Works <br /> AGENDA ITEM: Approval to perform night work for the Willow Creek 14-inch Water Main <br /> Line Stops and Valve Installations Project <br /> Approved By: Date: <br /> Director: Hash, Henry 11/14/2014 <br /> City Manager: McConnell, Craig Aa,A."7&614.4.A.LL II 2O /4. <br /> Item Summary (J <br /> Approval of this item will authorize night work for the purpose of completing water line <br /> stops (line freezing) and 14-inch water line valve installations for the Willow Creek Water <br /> Line Repair and Scour Protection Project. For the City to maintain water services for a <br /> significant portion of north Prescott, the water main will need to be frozen in two locations <br /> by a liquid nitrogen casing. The time to create the initial freeze plug ranges from 8-12 <br /> hours and the plug must be maintained through the entire valve installation project. The <br /> contractor needs to start the line freeze in the evening to allow for time required to <br /> complete the freezes prior to daytime work hours. The noise associated with the work will <br /> mainly be the idling vehicle. The closest residences to the work areas are 250 feet away. <br /> Upon approval of the request, the City Project Manager will mail a notification letter to all <br /> residences located within 1,000 feet of the line stop area, and will hand deliver <br /> notifications to the six residences that are within 500 feet. After the freeze plugs have <br /> been installed, the primary noise-generating work can be completed during daytime work <br /> hours. <br /> Background <br /> On October 14, 2014, Council approved a contract with Arizona Tap Master for Water <br /> Line Stops and 14-inch Water Line Valve installations for the Willow Creek Water Line <br /> Repair and Scour Protection Project. Once this work is completed, the overall water main <br /> replacement and scour protection project will be constructed. <br /> City Code Title 5-4-2: Specific Acts Prohibited, requires City Council approval for any <br /> night work between 8:00 PM and 6:00AM, Monday through Saturday. <br />
The URL can be used to link to this page
Your browser does not support the video tag.