My WebLink
|
Help
|
About
|
Sign Out
Home
CC - Agendas - City Council - STUDY SESSION - 3/16/2010
>
City Clerk
>
Permanent Records
>
Permanent
>
CC - Agendas - City Council - STUDY SESSION - 3/16/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:48:03 AM
Creation date
11/12/2018 11:26:14 AM
Metadata
Fields
Template:
CC - Agendas
Department
City Clerk
Sub
Clerk Records
Content
Agendas
Committee Status
Current
Document Type
City Council
Meeting Type
STUDY SESSION
Meeting Date
3/16/2010
Retention
Permanent
Retention Type
Permanent
Security
Public
Scanner
Conversion
Scan Date
2/26/2014
Record Series
GS1016, #10260
Supplemental fields
Conversion Number
2912702
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORDINANCE NO. 4721-1018 PAGE 5 <br /> 3-14-13: DEVELOPMENT FEES FOR WATER RESOURCES: <br /> (A) All new construction TO BE CONNECTED TO THE CITY'S WATER SYSTEM, <br /> within OR OUTSIDE the City limits, shall be assessed the following development <br /> fee for water resources: <br /> Meter <br /> Size <br /> (inches) <br /> 5/8 X 3/4 $ 4,944.71 <br /> 1 $11,185 8,257.73 <br /> 1 1/2 $22,970 16,465.84 <br /> 2 $ 2 26,355.26 <br /> (B) In the event that a one inch meter is required solely as a result of a house <br /> RESIDENTIAL UNIT beingequipped with an automatic fire sprinkler system, <br /> ri <br /> p Y <br /> then and it t"wt event the development fee to be assessed pursuant to this <br /> section shall be based on a 5/8" X 3/" meter size; provided, however, that this <br /> subsection shall not apply to residences 5,000 square feet or more in size. <br /> (C) In the event that an upsizing of meter size is required as a result of remodeling, <br /> renovation or expansion of a structure, the development fee to be assessed <br /> pursuant to this section shall be the difference between the development fee for <br /> the upsized meter versus the development fee for the existing meter. <br /> (D) For water meters and/or service lines greater than two inches (2"), and for meters <br /> utilized for irrigation only, the development fees to be assessed pursuant to this <br /> section shall be determined by the Public Works Director on the basis of <br /> projected water use stated in gallons per day, using the following formula: <br /> Development fee = fee for (5/8" X 3/4") meter x (applicant's projected gallons per <br /> day [GPD] water use/residential equivalent unit water use of 235 GPD). <br /> (E) The development fees to be assessed pursuant to this section shall be offset by <br /> any fees paid by an applicant pursuant to PCC Section 2-1-12-(I). <br /> (F) Fees collected pursuant to this section may only be used for the acquisition, <br /> operations and maintenance of additional water resources, as may be authorized <br /> pursuant to Arizona Revised Statutes section 9-463.05. <br /> (G) The fees provided for in this section shall be increased by five percent (5%) on <br /> May 1, 2007, and shall be increased five percent (5%) pc, =nu,m cach May 1 <br /> thereafter. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.