Laserfiche WebLink
EXHIBIT A <br /> City of Prescott <br /> 2012 Water Distribution System Model Update <br /> SCOPE OF WORK <br /> include changes in the planning of the Airport area. Carollo will meet with the City's <br /> planning and development group to obtain insights into the growth that is anticipated. A <br /> draft set of growth projections will be prepared for discussion with City staff. Unit water <br /> demands will be established based on the billing records and land use data. <br /> Growth plans and development will be prepared considering the availability and timing of <br /> the City's water resources. <br /> A workshop will be conducted where projections are presented in draft form to be <br /> reviewed and commented upon. Following the workshop the demand projections will be <br /> finalized with City input. <br /> 1.4 Operational Updates <br /> The model will be updated with changes that have occurred to the water system <br /> infrastructure and operations, including new pump curves, pump controls, PRV setpoints <br /> and other operational changes so that the model reflects the way that the system is <br /> operated today, based on information provided by the City. The model containing the <br /> updated information entered by the City based on the ISO modeling as well as the <br /> operational updates will be referred to as the 2012 model. <br /> 1.5 Model Validation <br /> Carollo will work with the City to conduct a limited field test of the water system by <br /> following the steps below: <br /> • Prepare a field test plan that identifies locations where pressure transducers could <br /> be located in the distribution system for up to a week to record pressures. The field <br /> test plan will be prepared following an evaluation of the data that can be made <br /> available that would be useful for model validation. <br /> • Work with City staff to install the pressure transducers owned by Carollo and the City <br /> for the first test. The City will then do the fieldwork for the field tests that have been <br /> developed in the field test plan. The City will then provide field test data to Carollo. <br /> • Compare the model results with the field data to determine if improvements need to <br /> be made to the model to improve the accuracy with which the model predicts actual <br /> conditions. The City and Carollo will work together to achieve a mutually acceptable <br /> accuracy range. <br /> Task 1.0 Deliverable: Prepare a draft section of the report that explains the model update and <br /> validation process, as well as the demand projections that will be applied in the model. This <br /> draft section will be prepared following the demand projections workshop and the model <br /> validation. The City will review the draft report section and comments received will be <br /> incorporated into the report final draft. <br /> h:\bd_phx\prescott\water model update\prescott water model update project 06192012.docx 3 <br />