My WebLink
|
Help
|
About
|
Sign Out
Home
CC - Agendas - City Council - REGULAR - 7/23/2013
>
City Clerk
>
Permanent Records
>
Permanent
>
CC - Agendas - City Council - REGULAR - 7/23/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:47:58 AM
Creation date
11/12/2018 11:27:18 AM
Metadata
Fields
Template:
CC - Agendas
Department
City Clerk
Sub
Clerk Records
Content
Agendas
Committee Status
Current
Document Type
City Council
Meeting Type
REGULAR
Meeting Date
7/23/2013
Retention
Permanent
Retention Type
Permanent
Security
Public
Scanner
Conversion
Scan Date
7/25/2013
Record Series
GS1016, #10260
Supplemental fields
Conversion Number
2857801
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D*Ibble <br />Engineering* <br />May 13, 2013 <br />Prescott Municipal Airport <br />Ernest A. Love Field <br />6546 Crystal Lane <br />Prescott AZ 86301 <br />Attention: Mr. Jeff Tripp <br />Community Development Director <br />RE: ENGINEERING SERVICES PROPOSAL <br />Authorization of Services No. 3 <br />Construction Phase Services <br />Change Order Request No 4: Additional Construction Administration <br />RW 21L-3R Runway Safety improvements <br />PRC Proiect No. 2010 D8003 <br />7500 North Dreamy Draw Drive <br />Suite 200 <br />Phoenix, Arizona 85020 <br />phone 602.957.1155 <br />fax 602.957.2838 <br />www.dibbiecorp.com <br />We appreciate the opportunity to provide additional construction administration services to meet the needs of Prescott <br />Municipal Airport. The additional construction administration services are needed due to the extended effort required <br />to close-out the project. The project completion was determined to be around the first week of May 2013, <br />approximately four months later than originally anticipated, (an additional two months beyond what was anticipated for <br />Change Order Request No. 3 based on the Contractor's submitted project schedule at that time). We have also included, <br />(as an Allowance Item), effort to continue coordinating with and supporting the City of Prescott and the Airport through <br />miscellaneous contractor claims. This effort cannot be worked without prior approval from the City/Airport. <br />The Dibble Engineering team additional efforts have been spent coordinating with the Contractor regarding contract <br />requirements, providing specification clarification, reviewing change requests, evaluating schedule issues and impacts, <br />providing additional daily on -site observation and inspections, additional construction administration, coordination and <br />attendance at additional construction meetings, coordination of claims, etc. <br />We are proposing an additional time -and -materials not -to -exceed fee of $50,977.28 to close-out the project. We are <br />also proposing an Allowance of $20,000 for contractor claim supportive services. <br />Transmitted herewith are the Fee Summary, Derivation of Fee Proposal Summary and Estimated Manhours for the <br />members of the team that were required to exceed their original limits. We greatly appreciate the opportunity to work <br />with Prescott Municipal Airport and are excited to be a part of this critical safety improvement project. If you need <br />additional information or have questions, please do not hesitate to call. <br />Sincerely, <br />Dibble En ineering <br />Steven E. Rex, P.E. <br />Chief Operations Officer <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.