Laserfiche WebLink
Prescott City Council Study Session—September 19,2006 Page 8 <br /> Community Development Director Tom Guice explained Estrella Hills was <br /> requesting preliminary plat approval and approval of a water service <br /> agreement and presented the following information: <br /> • the subdivision consisted of 10 lots on 13 acres <br /> • it was located north and west of the intersection of Green Lane and <br /> Meadowridge Road <br /> • access would be off Estrella Road via a public street <br /> • the street would be 28 feet wide, with curb, gutter and sidewalk, <br /> within a 50 foot right-of-way <br /> • the zoning was Single Family-35 <br /> • some of the area was on septic and the subdivision would extend <br /> sewer lines. <br /> Councilman Blair said he had lived in that area for 15 years and asked if <br /> the corner was going to be improved; this was a short cut to Granite <br /> Mountain Middle School and asked how far the road was going to be <br /> improved and if traffic control methods were going to be put in on the <br /> downhill slope of the road. Mr. Guice replied the portion of the street that <br /> fronts the subdivision and the streets within the subdivision would be <br /> paved and any traffic mitigation would have to go to the Transportation <br /> Coordinating Committee to review. <br /> itior <br /> Councilman Blair concluded saying once,the road was improved there <br /> would be more traffic and a traffic mitigation plan was needed because <br /> people traveled too fast along there. <br /> Mr. Guice mentioned the Final Plat would come to Council on October 3 <br /> and 10 and that could be a condition of approval of the final plat. <br /> Councilman Roecker asked if the one way in and one way out was <br /> approved by the Fire Department and Mr.Guice said it was acceptable. <br /> Councilman Blair asked to have a traffic counter put on the road to identify <br /> the amount of traffic and to have those numbers before the Final Plat <br /> came to Council for approval. <br /> Councilman Luzius remarked some of the lots had been moved down <br /> along the corridor and asked if the improvements on Estrella Road use the <br /> complete right-of-way. Mr. Guice said the road would be a full paving <br /> width of 28 feet with curb and gutter on both sides. <br /> Councilman Luzius asked if the current water allotment went away and a <br /> new allotment given and Mr.Guice said that was correct. <br />