Laserfiche WebLink
3. Project Assumptions <br /> 1. Study hydrology provided by the City shall be in compliance with FEMA standards. The City shall <br /> provide JEF with all hydrologic modeling documentation required for FEMA submittals. The Project <br /> Team shall not revise and/or modify hydrology provided by the City. The Project Team shall not <br /> perform new hydrologic modeling. <br /> 2. Proposal does not include permit or application fees. <br /> 3. Proposal does not include public notification. <br /> 4. Proposal does not include the analysis of flows from the Unnamed Wash entering Willow Creek <br /> Tributary at Clearwater Drive. <br /> 5. Proposal does not include an individual Environmental Permit submittal to the USACE. <br /> 6. Available Pothole data to be provided to JEF (at no cost to JEF)by the City for buried utilities in the <br /> project area. <br /> 7. Engineering Fee for Task 1.8 will be billed on an as needed basis to respond to FEMA comments. <br /> 4. Attachments <br /> Exhibit 1—Kelley/Wise Engineering, Inc., Scope of Services <br /> October 8,2012 <br /> Willow Creek and Willow Creek Tributary Restudy Page 6 of 6 <br />