Laserfiche WebLink
11.G.b I <br /> WBS-No WBS Input <br /> 4 01 22 20 00-0068 HR Flagperson For Traffic Control $4,629.42 <br /> Qty Unit Price Factor Total <br /> Installation 100 X $34.09 X 1.358 $4,629.42 <br /> Contractor Notes: Flagging during single lane operations-construction shift hours <br /> only. 20 days @ 5 hrs per day <br /> 5 01 22 23 00-0220 EA Mobilization of Steel Roadway PlatesMobilization for each site $2,581.16 <br /> location. <br /> Qty Unit Price Factor Total <br /> Installation 9 X $211.19 X 1.358 $2,581.16 ... <br /> Contractor Notes: 3 per location-3 locations O <br /> 6 01 22 23 00-0221 EA Place And Remove Steel Roadway Plates $6,223.44 d <br /> Qty Unit Price Factor Total m <br /> Installation 180 X $25.46 X 1.358 $6,223.44 w <br /> Contractor Notes: 3 per location,3 locations.Place and remove each day for trench O <br /> access.20 Days @ 9 plates a <br /> 7 01 22 23 00-0228 DAY 1"x 5'x 10'Steel Plate $13,763.93 £ <br /> d <br /> Qty Unit Price Factor Total c <br /> Installation 252 X $40.22 X 1.358 $13,763.93 c <br /> to <br /> Contractor Notes: 9 Plates will be in use for 28 days IS <br /> 8 01 22 23 00-1413 DAY 3,700 To 4,000 Gallon Water Truck With Full-Time Driver $5,158.28 co <br /> Qty Unit Price Factor Total = <br /> Installation 4 X $949.61 X 1.358 $5,158.28 to <br /> a <br /> ca <br /> Contractor Notes: Dust Abatement > <br /> co <br /> 9 01 55 26 00-0046 DAY Stop(Or Slow)Paddle With Handle $21.40 > <br /> Qty Unit Price Factor Total et <br /> Installation 8 X $1.97 X 1.358 $21.40 `1' <br /> N <br /> 10 01 55 26 00-0052 DAY Channelizer Drum $1,779.52 0) <br /> Qty Unit Price Factor Total <br /> v <br /> Installation 840 X $1.56 X 1.358 $1,779.52 'C <br /> Contractor Notes: 3 locations with tapers and lane closure-8 per location for 35 days m <br /> 11 01 55 26 00-0061 DAY Type II Barricade,Up To 3'Wide With Two Reflective Rails Each $644.51 c <br /> Side .— <br /> or <br /> Qty Unit Price Factor Total 0 <br /> r <br /> Installation 210 X $2.26 X 1.358 $644.51 ' <br /> c <br /> Contractor Notes: 3 Sidewalk closure locations,2 per location for 35 days = <br /> 12 01 55 26 00-0073 DAY Type A Or C Flasher $762.92 ;-; <br /> c <br /> Qty Unit Price Factor Total d <br /> Installation 1060 X $0.53 X 1.358 $762.92 t <br /> V <br /> 13 01 55 26 00-0118 DAY Construction Sign,30"x 24"Aluminum Sign With Portable Stand $872.65 m <br /> Qty Unit Price Factor Total Q <br /> Installation 210 X $3.06 X 1.358 $872.65 <br /> Contractor Notes: Sidewalk closed-6 each for 35 days <br /> 14 01 55 26 00-0136 DAY Construction Sign,48"x 48"Aluminum Sign With Portable Stand $6,233.22 <br /> Qty Unit Price Factor Total <br /> Installation 850 X $5.40 X 1.358 $6,233.22 <br /> Contractor Notes: 34 signs will be in use for majority of project-25 days <br /> Contractor Price Proprosal Details-WBS 2 of 6 <br /> This report was not generated or reviewed by your Account Manager of The Gordian Group <br /> I Packet Pg. 211 I <br />