Laserfiche WebLink
I 11.G.b <br /> WBS-No WBS Input <br /> 15 01 55 26 00-0183 EA Place And Remove>250 Panels/Channelizers By Hand From $1.106.50 <br /> Roadside <br /> Qty Unit Price Factor Total <br /> Installation 840 X $0.97 X 1.358 $1,106.50 <br /> 16 01 55 26 00-0186 EA Place And Remove Portable Sign And Stand From Roadside $669.49 <br /> Qty Unit Price Factor Total <br /> Installation 425 X $1.16 X 1.358 $669.49 <br /> 17 01 56 26 00-0175 LF 48"High With Posts At 8'On Center,Plastic Mesh Temporary $879.98 <br /> Safety Fence y <br /> Qty Unit Price Factor Total o <br /> Installation 360 X $1.80 X 1.358 $879.98 EL <br /> Contractor Notes: 3 Locations @ 120 LF Each. Remove and Re-install 3 Times aa) <br /> E <br /> 18 01 71 13 00-0002 EA Equipment Delivery,Pickup,Mobilization And Demobilization Using $1,241.20 > <br /> A Rollback Flatbed Trucklncludes loading,tie-down of equipment, p <br /> delivery of equipment,off loading on site,rigging,dismantling, O. <br /> loading for return and transporting away.For equipment such as E <br /> trenchers,skid-steer loaders(bobcats),industrial warehouse — <br /> forklifts,sweepers,scissor platform lifts,telescoping and p) <br /> articulating boom manlifts with up to 40'boom lengths,etc. co <br /> Qty Unit Price Factor Total 'to <br /> Installation 7 X $130.57 X 1.358 $1,241.20 G <br /> co <br /> Contractor Notes: Truck mob for haul off of material-2 trucks. Truck mob for =_ <br /> material placement-4 trucks. Misc equipment Mob-for installing I <br /> pipe and hand compaction of soil •- <br /> a. <br /> 19 01 71 13 00-0003 EA Standard Equipment Delivery,Pickup,Mobilization And $7,061.75 to <br /> Demobilization Using A Tractor Trailer With Up To 53'Bedlncludes } <br /> loading,tie-down of equipment,delivery of equipment,off loading <br /> on site,rigging,dismantling,loading for return and transporting d; <br /> away.For equipment such as bulldozers,motor scrapers,hydraulic co <br /> excavators,gradalls,road graders,loader-backhoes,heavy duty N <br /> construction loaders,tractors,pavers,rollers,bridge finishers, <br /> straight mast construction forklifts,telescoping boom rough terrain c <br /> construction forklifts,telescoping and articulating boom manlifts •- <br /> with>40'boom lengths,etc. •� <br /> Qty Unit Price Factor Total d <br /> d <br /> Installation 9 X $577.79 X 1.358 $7,061.75 co <br /> co <br /> Contractor Notes: 2 Backhoe,trench roller,pipe delivery,tc delivery,water truck, c <br /> Subcontractor Mob-Concrete and Saw Cutting(2 each) 0 <br /> 20 01 74 19 00-0036 CY Excavated Dirt Landfill Dump Fee $1,401.73 y <br /> Qty Unit Price Factor Total G <br /> Installation 130 X $7.94 X 1.358 $1,401.73 I <br /> Contractor Notes: 130 CY's from trench crossing and pipe installation locations-6 c <br /> locations ar <br /> E <br /> 21 01 74 19 00-0037 CY Asphalt,Concrete,Gravel And Subgrade Material, Landfill Dump $411.15 r <br /> Fee ctoo <br /> Qty Unit Price Factor Total Q <br /> Installation 18 X $16.82 X 1.358 $411.15 <br /> Contractor Notes: 6 CY's of AC and Concrete for each of the 3 locations <br /> 22 01 74 19 00-0039 CYM Hauling On Paved Roads,First 15 Miles $1,427.99 <br /> Qty Unit Price Factor Total <br /> Installation 2146 X $0.49 X 1.358 $1,427.99 <br /> Contractor Notes: 148 CY's @ 14.5 Miles for Haul off. <br /> Contractor Price Proprosal Details-WBS 3 of 6 <br /> This report was not generated or reviewed by your Account Manager of The Gordian Group <br /> I Packet Pg.212 I <br />