I 11.G.b
<br /> WBS-No WBS Input
<br /> 15 01 55 26 00-0183 EA Place And Remove>250 Panels/Channelizers By Hand From $1.106.50
<br /> Roadside
<br /> Qty Unit Price Factor Total
<br /> Installation 840 X $0.97 X 1.358 $1,106.50
<br /> 16 01 55 26 00-0186 EA Place And Remove Portable Sign And Stand From Roadside $669.49
<br /> Qty Unit Price Factor Total
<br /> Installation 425 X $1.16 X 1.358 $669.49
<br /> 17 01 56 26 00-0175 LF 48"High With Posts At 8'On Center,Plastic Mesh Temporary $879.98
<br /> Safety Fence y
<br /> Qty Unit Price Factor Total o
<br /> Installation 360 X $1.80 X 1.358 $879.98 EL
<br /> Contractor Notes: 3 Locations @ 120 LF Each. Remove and Re-install 3 Times aa)
<br /> E
<br /> 18 01 71 13 00-0002 EA Equipment Delivery,Pickup,Mobilization And Demobilization Using $1,241.20 >
<br /> A Rollback Flatbed Trucklncludes loading,tie-down of equipment, p
<br /> delivery of equipment,off loading on site,rigging,dismantling, O.
<br /> loading for return and transporting away.For equipment such as E
<br /> trenchers,skid-steer loaders(bobcats),industrial warehouse —
<br /> forklifts,sweepers,scissor platform lifts,telescoping and p)
<br /> articulating boom manlifts with up to 40'boom lengths,etc. co
<br /> Qty Unit Price Factor Total 'to
<br /> Installation 7 X $130.57 X 1.358 $1,241.20 G
<br /> co
<br /> Contractor Notes: Truck mob for haul off of material-2 trucks. Truck mob for =_
<br /> material placement-4 trucks. Misc equipment Mob-for installing I
<br /> pipe and hand compaction of soil •-
<br /> a.
<br /> 19 01 71 13 00-0003 EA Standard Equipment Delivery,Pickup,Mobilization And $7,061.75 to
<br /> Demobilization Using A Tractor Trailer With Up To 53'Bedlncludes }
<br /> loading,tie-down of equipment,delivery of equipment,off loading
<br /> on site,rigging,dismantling,loading for return and transporting d;
<br /> away.For equipment such as bulldozers,motor scrapers,hydraulic co
<br /> excavators,gradalls,road graders,loader-backhoes,heavy duty N
<br /> construction loaders,tractors,pavers,rollers,bridge finishers,
<br /> straight mast construction forklifts,telescoping boom rough terrain c
<br /> construction forklifts,telescoping and articulating boom manlifts •-
<br /> with>40'boom lengths,etc. •�
<br /> Qty Unit Price Factor Total d
<br /> d
<br /> Installation 9 X $577.79 X 1.358 $7,061.75 co
<br /> co
<br /> Contractor Notes: 2 Backhoe,trench roller,pipe delivery,tc delivery,water truck, c
<br /> Subcontractor Mob-Concrete and Saw Cutting(2 each) 0
<br /> 20 01 74 19 00-0036 CY Excavated Dirt Landfill Dump Fee $1,401.73 y
<br /> Qty Unit Price Factor Total G
<br /> Installation 130 X $7.94 X 1.358 $1,401.73 I
<br /> Contractor Notes: 130 CY's from trench crossing and pipe installation locations-6 c
<br /> locations ar
<br /> E
<br /> 21 01 74 19 00-0037 CY Asphalt,Concrete,Gravel And Subgrade Material, Landfill Dump $411.15 r
<br /> Fee ctoo
<br /> Qty Unit Price Factor Total Q
<br /> Installation 18 X $16.82 X 1.358 $411.15
<br /> Contractor Notes: 6 CY's of AC and Concrete for each of the 3 locations
<br /> 22 01 74 19 00-0039 CYM Hauling On Paved Roads,First 15 Miles $1,427.99
<br /> Qty Unit Price Factor Total
<br /> Installation 2146 X $0.49 X 1.358 $1,427.99
<br /> Contractor Notes: 148 CY's @ 14.5 Miles for Haul off.
<br /> Contractor Price Proprosal Details-WBS 3 of 6
<br /> This report was not generated or reviewed by your Account Manager of The Gordian Group
<br /> I Packet Pg.212 I
<br />
|