My WebLink
|
Help
|
About
|
Sign Out
Home
CC - Agendas - City Council - REGULAR - 5/14/2019
>
City Clerk
>
Permanent Records
>
Permanent
>
CC - Agendas - City Council - REGULAR - 5/14/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:47:57 AM
Creation date
5/15/2019 1:53:34 PM
Metadata
Fields
Template:
CC - Agendas
Department
City Clerk
Sub
Clerk Records
Content
Agendas
Committee Status
Current
Document Type
City Council
Meeting Type
REGULAR
Meeting Date
5/14/2019
Retention
Permanent
Retention Type
Permanent
Security
Public
Scanner
COP\francis.beegle
Scan Date
5/15/2019
Record Series
GS1016, #10260
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I 8.E <br /> cITYor PRESCOTT <br /> �11Uy�J/Zda1Gt`d!J/G COUNCIL AGENDA MEMO <br /> MEETING DATE/TYPE: VOTING MEETING 5-14-19 <br /> DEPARTMENT: Public Works <br /> AGENDA ITEM: Award of City Contract No. 2019-219 to Asphalt Paving & Supply, Inc., <br /> for the Prescott Lakes Parkway Water Main Extension Project, in the amount of <br /> $155,855.55. Funding is available in the Water Fund. <br /> FUNDING SOURCE: Water Fund <br /> Approved By: Michael Lamar, City Manager <br /> Item Summary <br /> This item is to approve City Contract No. 2019-219 with Asphalt Paving & Supply, Inc. <br /> for construction of the Prescott Lakes Parkway Water Main Extension Project in the <br /> amount of, $155,855.55. The location of the project is shown on the attached vicinity <br /> map. <br /> Background <br /> The Prescott Lakes Parkway Water Main Extension Project generally consists of <br /> construction of a new 12-inch water main along the east side of Prescott Lakes <br /> Parkway. The main will connect to an existing 8-inch water main in Pressure Zone 14 <br /> and will also connect to a 12-inch main currently in Pressure Zone 0 that will become <br /> Pressure Zone 14 at the completion of the project. This small water main extension will <br /> have multiple positive benefits to the City's water system, including reducing high <br /> pressures in portions of Willow Lake Road, creating a looped system in Zone 14 and <br /> eliminating a downstream pressure zone and associated pressure reducing valve.(PRV) <br /> station. <br /> On January 9, 2019, the City entered into professional services Contract No. 2019-017 <br /> with Kimley-Horn and Associates for design and other engineering services for the <br /> Prescott Lakes Parkway Water Main Extension Project in the amount of $35,170.00. <br /> Bid ready plans and bid documents have been completed and the project subsequently <br /> advertised for construction bids. <br /> Bid Results <br /> The project was publicly bid on two consecutive weeks, March 31, 2019, and April 7, <br /> 2019. Five (5) bids were opened April 18, 2019, with the following results: <br /> I Packet Pg.75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.