Laserfiche WebLink
I 8.C.b I <br /> • Development of detailed control panel cost estimates <br /> • Development of control panel shop drawings <br /> • Development of detailed delivery schedule for control panel assembly <br /> • Build control panels <br /> • Perform Factory Acceptance Test, including loading basic PLC program for testing <br /> purposes <br /> • Development of final "As-Built" drawings 7 <br /> • Installation of new control panels o <br /> • Removal of existing control panel components o <br /> • Installation of control panel components in retrofitted panels c) <br /> a) <br /> • Perform site acceptance testing a) <br /> • Provide startup/cutover support E <br /> m <br /> to <br /> 2.0 FEES AND PAYMENTS c <br /> N <br /> tn <br /> 2.1 REGISTRATION REQUIREMENT IN CONSULTANT SELF SERVICE(VSS) o <br /> O. <br /> In order to do business with the City of Buckeye, all Consultants must register at ca <br /> https://selfservice.buckeveaz.gov/MSS. Please be aware, Consultants that do not c <br /> register and verify their information, including uploading a W-9 form to their profile, a <br /> a <br /> may experience delays in processing of invoices and will not be able to do business with 0 <br /> a <br /> the City. c.) <br /> co <br /> co <br /> 2.2 BUSINESS LICENSE REQUIREMENT r, <br /> r <br /> Consultants doing business within the City limits must obtain a City of Buckeye Business as <br /> License in order to do business with the City. Apply for a Business License at o <br /> http://www.buckeveaz.gov/business-licenses/. 0 <br /> o <br /> 2.3 FEE SCHEDULE o <br /> U <br /> Each Task Order over One Hundred Thousand Dollars ($100,000.00) shall be subject to d <br /> City Council Approval. <br /> 0 <br /> 2.4 PAYMENT APPROVAL <br /> c <br /> aw <br /> E <br /> The time spent for each task shall be recorded and submitted to the Contract o <br /> Administrator. Consultant shall maintain all books, papers, documents, accounting a <br /> records and other evidence pertaining to time billed and to costs incurred and make <br /> such materials available at all reasonable times during the contract period. <br /> Monthly payments shall be made to the Consultant on the basis of a progress report <br /> prepared and submitted by the Consultant for work completed through the last day of <br /> On-Call SCADA Improvements 2 <br /> Rottweiler Controls,LLC <br /> Contract No:31700019 <br /> I Packet Pg.63 I <br />