My WebLink
|
Help
|
About
|
Sign Out
Home
CC - Agendas - City Council - REGULAR - 12/2/2014
>
City Clerk
>
Permanent Records
>
Permanent
>
CC - Agendas - City Council - REGULAR - 12/2/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:47:56 AM
Creation date
11/12/2018 11:25:16 AM
Metadata
Fields
Template:
CC - Agendas
Department
City Clerk
Sub
Clerk Records
Content
Agendas
Committee Status
Current
Document Type
City Council
Meeting Type
REGULAR
Meeting Date
12/2/2014
Retention
Permanent
Retention Type
Permanent
Security
Public
Scanner
Conversion
Scan Date
12/2/2014
Record Series
GS1016, #10260
Supplemental fields
Conversion Number
2976031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phase 2: Concept Development <br /> The Concept Development phase will focus on development of a concept development envelope — a <br /> "portable model" of the proposed initial and ultimate Terminal Building, related facilities, automobile <br /> parking, and airside apron, gates, and aircraft movement areas. This conceptual envelope will be fitted to <br /> each of the two alternative sites in Phase 3. <br /> All calculations will be based on available activity data and projections that are found to be acceptable to the <br /> Airport, and that are consistent with information previously presented to the City Council. This scope of <br /> services does not include the generation of new forecast projections for enplaned passengers, aviation <br /> activity,or for vehicular traffic. <br /> A. Develop building envelope—initial and ultimate footprint <br /> The Consultant Team will prepare a general conceptual layout of the Terminal Building based on <br /> approximate space requirements for the present aircraft and passenger activity, and also considering <br /> future expansion to accommodate a reasonable maximum potential projected growth. The building <br /> layout will be limited to a general envelope that will accommodate lobby,ticketing, baggage claim area, <br /> passenger gates, security, vendor areas, airport offices, passenger movement areas, baggage handling, <br /> and related features. Space for general aviation activity will also be considered in the calculations. A <br /> detailed floor plan will not be provided. The work will be limited to definition of the initial and ultimate <br /> development footprint that may be required to accommodate the projected Terminal Building activity. <br /> B. Develop terminal gate movement area and aircraft parking envelope(airside development envelope) <br /> The Consultant Team will prepare a general conceptual layout for the air carrier gate positions and <br /> ... jetways, pushback and holding areas, air carrier and general aviation aircraft parking, and aircraft <br /> movement (taxi) areas. The layout will include the initial requirements as well as allowance for ultimate <br /> expansion to accommodate a reasonable maximum potential increase in activity. <br /> C. Develop automobile parking envelope(landside development envelope) <br /> The Consultant Team will prepare a general conceptual layout for automobile parking and onsite <br /> vehicular access roadways. The layout will include adequate parking space for the initial requirements <br /> as well as allowance for ultimate expansion to accommodate a reasonable maximum potential increase <br /> in activity. <br /> r.. <br /> September 12,2014 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.