Phase 1: Project Initiation and Data Collection <br /> The initial phase of the work will begin with an initial meeting at the Airport. The work under this phase will <br /> then proceed with research of available information, initial site investigations, and collection of the existing <br /> available data necessary to form the basis of the analytical elements of the Assessment. Anticipated tasks in <br /> this phase are as follows: <br /> A. Initial meeting and project initiation <br /> The Consultant Team will attend an initial project meeting with Airport and City of Prescott staff to <br /> discuss the work process and project schedule. <br /> Prior to the initial meeting, the Consultant Team will prepare a graphic flow chart to describe the <br /> proposed work process, time line, and decision points. The flow chart will be presented at the initial <br /> meeting and will be kept up to date throughout the work process. <br /> B. Collection of available information <br /> The Consultant Team will prepare a Request for Information that will include a list of the existing <br /> available information and data that will be used as the basis for concept development in the <br /> Assessment. The required information may include(but not be limited to)the following: <br /> • Passenger enplanement records <br /> • Air Traffic Control Tower(ATCT) records of aircraft operations <br /> • Current airline schedules and anticipated future changes <br /> • Plans for future roadway extensions in the Airport area <br /> • Available roadway traffic flow projections(from City Engineer) <br /> • County Assessor's maps and parcel information for affected adjacent real properties <br /> • The latest approved Airport Master Plan, as adopted by the City Council <br /> • Available contour maps and/or topographic surveys of the areas to be studied <br /> • Valuation of adjacent real properties that may be affected by the Terminal development <br /> • The most current available aerial photography <br /> • Current utility record mapping <br /> Topographic or property surveys are not included in this scope of services. <br /> The Consultant Team will compile a hard copy reference file of the existing information to be used in the <br /> work as well as a bibliography of the records to be used. The list of information will be submitted to the <br /> Airport for review and approval prior to proceeding with the following phases of the work. <br /> The Consultant Team will prepare an AutoCad base map for use on this project. The base map will be <br /> based on the most current draft Airport Layout Plan. <br /> C. Verification of existing conditions <br /> The Consultant Team will visit the alternative sites during initial planning in order to verify the accuracy <br /> of record drawings and information. It is the intent that this site visit will be conducted on the same day <br /> as the initial meeting at the airport. <br /> September 12,2014 2 <br />