My WebLink
|
Help
|
About
|
Sign Out
Home
CC - Agendas - City Council - REGULAR - 5/13/2014
>
City Clerk
>
Permanent Records
>
Permanent
>
CC - Agendas - City Council - REGULAR - 5/13/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:47:57 AM
Creation date
11/12/2018 11:25:30 AM
Metadata
Fields
Template:
CC - Agendas
Department
City Clerk
Sub
Clerk Records
Content
Agendas
Committee Status
Current
Document Type
City Council
Meeting Type
REGULAR
Meeting Date
5/13/2014
Retention
Permanent
Retention Type
Permanent
Security
Public
Scanner
Conversion
Scan Date
5/15/2014
Record Series
GS1016, #10260
Supplemental fields
Conversion Number
2928810
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 . • <br /> rrrvor PRESCOTT <br /> if0N't~ COUNCIL AGENDA MEMO <br /> MEETING DATE/TYPES: VOTING SESSION 5-13-14 <br /> DEPARTMENT: Public Works <br /> AGENDA ITEM: Award of bid and contract for the Park Avenue Improvements Project to <br /> Fann Contracting, Inc., in the amount of $5,457,035.50 (City Contract No. 2014-185; One <br /> Cent Streets and Open Space, Water, and Wastewater Funds) <br /> Approved By: Date: <br /> Director: Hash, Henry 105/06/2014 <br /> City Manager: McConnell, Craig e«4jf14164. w. _ 5 6 -I+ <br /> 0 <br /> Item Summary <br /> This item is to award a bid and contract for removal and replacement of the existing Park <br /> Avenue pavement structure, as well as curbs and gutters, sidewalks, water and sewer <br /> lines and services, and storm drains. <br /> Background <br /> The project limits are Park Avenue from West Gurley Street to Copper Basin Road. Utility <br /> upgrades along Park Avenue will extend north into Gurley Street. <br /> The Pavement Condition Rating for Park Avenue is one of the lowest in the system for <br /> major collector streets. Sight lines at the intersecting side streets will be greatly improved. <br /> Curb returns, handicap ramps, and vertical curves along the corridor will meet current <br /> AASHTO standards. <br /> The water main on Park Avenue will be replaced with approximately 3,100 If of new 8- <br /> inch ductile iron water main with new services. The existing sewer main on Park Avenue <br /> will be replaced with approximately 4,100 If of new 8-inch PVC sewer main with new <br /> manholes and services. New storm drain piping and structures will be constructed from <br /> Country Club Drive to Glenwood Avenue. <br /> Protection and preservation of historic features in the Park Avenue Historic District has <br /> been provided for in the contract documents. During street reconstruction, the contractor <br /> will remove the old light bases and install new bases and conduits for the historic street <br />
The URL can be used to link to this page
Your browser does not support the video tag.