Laserfiche WebLink
EXHIBIT A <br /> City of Prescott <br /> 2012 Water Distribution System Model Update <br /> SCOPE OF WORK <br /> TASK 2.0 WATER SYSTEM EVALUATIONS <br /> 2.1 Existing System Evaluation <br /> The current water distribution system will be evaluated using performance criteria that <br /> will be agreed upon with the City. The performance criteria may consist of maximum and <br /> minimum pressures, maximum velocities, required storage, number of pump and pump <br /> station redundancy, and emergency reserves. The performance criteria will reflect the <br /> building code that is currently in use by the City. <br /> 2.2 Pressure Zone Evaluation <br /> Pressure zones in the water distribution system will be evaluated to identify potential <br /> ways to simplify the distribution system to reduce operating and maintenance costs, as <br /> well as to simplify system operations. The pressure zone schematic that was created <br /> previously will be updated to reflect the current water system configuration and also the <br /> buildout configuration to aid in simplifying pressure zones. Topographic representations <br /> of the consolidated pressure zones will be prepared so that the impact of combining <br /> pressure zones can be more easily understood using KML files created by the model <br /> that can be displayed using Google Earth. <br /> 2.3 Zone 12 Well Supply Evaluation <br /> A water delivery strategy for the wells that are and may be constructed in the airport <br /> area will be developed. Currently wells serve primarily Zone 12, but as additional well <br /> capacity is developed, a means of delivering this water into the North-South Zone is <br /> needed so that these wells could augment water supplies from the Chino wells. These <br /> additional wells will provide enhanced reliability to the Prescott water system. <br /> 2.4 Storage and Booster Evaluation <br /> Water storage and booster pump capacity will be evaluated to optimize approaches to <br /> effectively provide storage and emergency water supplies. The Prescott water system <br /> does not necessarily have storage in all the desired locations, and in some cases there <br /> may be excess storage that could benefit the water system if the system was configured <br /> accordingly. This evaluation will look at the water storage throughout the water <br /> distribution system and a plan will be developed to optimize storage and pumping <br /> capabilities. Needed capital improvements will be identified where appropriate. <br /> 2.5 Fire Flow Evaluation <br /> The capability the water system has of delivering fire flows will be evaluated. Fire flow <br /> requirements will be associated with each hydrant that is modeled, based on the land <br /> use types that are near the hydrant. Where deficiencies are identified, capital <br /> improvements or water system configuration changes will be identified to improve fire <br /> flows. System configuration changes could include PRVs from adjacent zones to deliver <br /> h:\bd_phx\prescott\water model update\prescott water model update project 06192012.docx 4 <br />